I have a Camunda flow with a Call Activity (sequential), the call Activity calls several subflows based on a list of process keys (ids) in a certain order.
For instance I get a list of [“flow-1”, “flow-2”], then flow-1.bpmn and flow-2.bpmn are executed.
But, also in the scope is flow specific data, added to the scope in “Read LOT Configuration”. For instance [{“name”, “flow-1”, “identifier” : “some-data”}, {name: “flow-2”, “identifier” : “some other data”}].
I would like the call activity to determine that for flow-1, I need to send the flow-1 related object along. I do not want to send the entire collection, but only the flow specific data.
How can I achieve this?